学术活动

学术报告

当前位置: 首页 - 学术活动 - 学术报告 - 正文

Time Irreversibility in a Production Planning Problem

发布日期:2014-12-30

点击量:

主讲人 时间
地点

Yun Duan

Stanford University USA

【主题】Time Irreversibility in a Production Planning Problem

【时间】2002-5-24,上午09:30-10:30

【地点】清华经管学院 北407

【语言】中文/英文

【内容摘要】

We introduce a new methodology for analyzing production planning problems. The methodology relies on perturbation between production levels of two consecutive periods. Firstly the local structure of the optimal production vector is determined. Next we prove the uniqueness and optimality of the feasible production vector which satisfies our local structure between consecutive periods. Based on uniqueness, we present our algorithm. The algorithm uses a merge technique in which we merge consecutive ``good'' subvectors, which are not ``well matched'', into be a single ``good'' subvector. Finally we prove the ``time irreversibility'' property of the optimal production vector when some parameters change.

关闭

地址:清华大学经济管理学院伟伦楼447(100084)

邮箱:rccm@mail.tsinghua.edu.cn

电话:010-62771663

传真:010-62784555

Copyright 2025清华大学现代管理研究中心 版权所有